Fee Schedule

West Boylston Fire Department Permits

 CMRFee
Blasting527CMR 13.04$75
Compressed Natural Gas (CNG)527CMR 26.08$25
Cutting and Welding527CMR 39.04$50
Fire Alarm (Non-Residential)527CMR 10.03(15)$50
Fire Alarm (Non-Residential) Re-Inspection $25
Fire Prevention Systems (Sprinkler)527CMR 10.03(15) 
1-50 Heads $50
51-100 Heads $100
101-200 Heads $150
201 + Heads $200
Re-inspect Sprinkler system 50% of Initial fee
Fireworks Display527CMR 2.05, MGL C148, s 39A$100
Smokeless Black Powder Permit (Residential) $35
Smokeless Black Powder Permit (Commercial) $75
Flammable/Combustible Liquid Storage527CMR 14.03, 15.04, MGL C148 s23 
1-1,000 Gallons $50
1,001-10,000 Gallons  $50
over 10,000 Gallons $100
Flammable Gases & Solid Storage527CMR 14.03$40
Fuel Transfer Operation527CMR 5.08$40
Limited Special Effects527CMR 2.09$25
LP-Gas Above Ground527CMR 6.08$50
LP-Gas Underground $50
LP-Gas Re-Inspection $25
Oil Burning Equipment527CMR 4.03$40
Oil Burning Equipment Re-Inspection $25
Open Air/Brush527CMR 10.02$15
Salamanders / Temporary Heat   527CMR 20.01 $25
Smoke / CO Detectors ResidentialMGL C148, s 26F, 26F1/2$50
Storage of Combustible Materials527CMR 10.03$25
Tank Vehicles527CMR 8.04 & 14.03$40
Re-Inspection Tanks and Containers527CMR 9.06, 9.07, MGL C148, s 38A   
Install / Tank $40
Removal / Tank $75
Tank Install Re-Inspection $25
Tar Kettles527CMR 10.03$25
Torches and Heat Producing Devices527CMR 10.24$25
Transportation of Combustible Liquids527CMR 8.04$40